Skip to main content

Bitumen export purchasing checklist: grade, price, logistics and payment

Checklist d’achat de bitume à l’export
ENERGY TRADING · PRACTICAL GUIDES

Purchasing checklist for bitumen exports

Grade, price, logistics and payment: lock everything down before committing.

Request a quotation →

An export bitumen purchase succeeds or fails on details: a poorly defined grade, a misunderstood Incoterm, an incomplete set of documents or vague payment terms. Reviewing each point before committing avoids most disputes and extra costs.

Here is a structured checklist, from product to payment, to secure an import operation.

Define the grade precisely

Everything starts with a clear technical requirement. The grade must match the climate and traffic of the site rather than habit. The method is set out in our guide to choosing a bitumen grade by climate and traffic.

  • Grade suited to the target climate and traffic.
  • Compliance with standards verifiable against the EN 12591 standard.
  • Certificate of analysis required and tied to the batch.

Frame the price and the Incoterm

Prices can only be compared on the same Incoterm. The FOB price, freight and port charges make up the delivered price, as explained in our guide to FOB price and delivered price. The allocation of responsibilities depends on the Incoterm chosen.

  • Incoterm clearly defined and understood.
  • Delivered-to-site price worked out in full, beyond the FOB price alone.
  • Quotation basis and currency identified.

Secure the logistics

Logistics determine the real cost and the lead times. The choice of destination port and the document set must be settled before committing.

  • Destination port equipped to receive a heated product.
  • Sea transit times and on-carriage built into the schedule.
  • Document set complete and consistent.

Secure the payment

Payment terms must be written down and understood before the order. At E-Station, payment is made by bank transfer, with a 50% deposit on order and the balance against presentation of the shipping documents. The letter of credit is reserved for established companies, after a first transaction of at least 500 MT settled by bank transfer.

These mechanisms are explained in detail in our guide to letter of credit or bank transfer.

Plan the schedule ahead

The best price is lost if the order comes too late. The supply schedule must work back from the site requirement to the purchase date, lead times included, to avoid the demand peak and stock-outs.

Check on receipt

The checklist continues after the order. On arrival, the document check, the temperature reading and controlled unloading confirm that the delivered batch actually conforms.

Frequently asked questions

Which point is most often overlooked?

Consistency between the grade ordered, the certificate of analysis and the Incoterm. A discrepancy on any one of these points is enough to cause a dispute or a hold-up.

What needs to be settled before ordering?

The grade, the Incoterm, the logistics and the payment. These four areas must be written down and understood before committing.

How can this whole process be simplified?

By working with a single contact who frames grade, price, logistics, documents and payment in one offer, backed by a certificate of analysis.

Need a quotation? E-Station draws up a priced offer, grade by grade, with a certificate of analysis and specified delivery terms. Request a quotation.

No comments yet!

Votre adresse email ne sera pas publiée.