Once the bitumen grade has been set for a project, it still has to be ordered without error. Between the line in the specifications and the tanker arriving at the asphalt plant, the grade passes through several hands: the engineering firm, the buyer, the trader, the refinery and the carrier. Each step can introduce a discrepancy. This guide describes the checks E-Station applies before and after every order.
Choosing the grade itself, based on the climate of the laying area and the expected traffic, is covered in our guide to choosing the right bitumen grade for climate and traffic. Here we start from the grade selected and follow its order through to delivery.
Reading the specifications before requesting a quotation
The specifications designate the grade by its standardized class: 35/50, 50/70 or 70/100 in Europe, sometimes VG-30 or a Performance Grade in markets that follow Indian or American standards. Before any price request, the buyer checks the standard cited, the exact class and any additional requirements, such as a polymer-modified bitumen on the most heavily loaded areas. A request that mentions “paving bitumen” without a class produces offers that cannot be compared.
When the local market’s standard differs from the European one, the equivalence between classes is discussed with the supplier before ordering. An Indian 60/70 and a European 50/70 overlap widely without being identical. Our comparative guide to grades gives the usual equivalences.
Requiring the EN 12591 standard on the quotation
In Europe, paving bitumens fall under the EN 12591 standard, which sets for each class the ranges for penetration, softening point and several other properties. The quotation must cite this standard and the class required. This gives the buyer an enforceable reference: if the lot falls outside the ranges, non-compliance can be established objectively. The points of the standard that matter to a buyer are detailed in our article on the EN 12591 standard from the buyer’s point of view.
A complete quotation also specifies packaging, Incoterm, validity period and payment terms. Our method for reading a bitumen quotation goes through these lines.
Checking the lot’s certificate of analysis
The certificate of analysis links a specific lot to the values measured in the laboratory. The buyer checks that the lot number matches the shipping documents, that penetration at 25 °C and softening point fall within the ranges of the class ordered, and that the analysis date is consistent with the loading date. A generic certificate with no lot number guarantees nothing about the product received. E-Station attaches a lot-specific certificate of analysis to every lot.
How to read these two measurements is explained in our guide to penetration and softening point.
Checking the grade on delivery
On arrival, a sample taken from the lot confirms the values on the certificate. This counter-analysis is especially worthwhile for imports, when the product has traveled for several weeks and been reheated. Overheating during transport or storage hardens the binder: a mishandled 50/70 can behave like a harder grade. Inspection methods and the role of an independent inspector are described in our article onbitumen quality inspection.
The most common ordering mistakes
The first mistake is ordering the grade used on the previous project out of habit, when the climate or traffic has changed. The second is an incomplete designation, for example a “60/70 bitumen” requested from a European supplier, who will then deliver a 50/70 or a 70/100. The third, common with imports, is accepting a certificate without a lot number. The fourth is comparing offers for different grades on price per ton alone; the gap between two classes remains small compared with the cost of rebuilding a pavement, as shown on our page on the price of bitumen.
How E-Station secures your order
Before quoting, we review with you the grade designation and the standard cited in the specifications. The quotation states the standard, class, packaging and Incoterm. Every lot ships with its certificate of analysis, and on request we arrange an inspection at loading or on arrival. For export supply, we also check that the requested grade is available from our partner refineries within the project timeline.
Frequently asked questions
What information is needed to order a bitumen grade?
The exact class (for example 50/70), the standard cited in the specifications, the volume, the packaging required, the delivery location and the date needed.
Is the certificate of analysis enough to guarantee the grade?
It guarantees the lot analyzed at departure. For imports, a counter-analysis on arrival confirms that transport and storage have not altered the binder.
Are 60/70 and 50/70 interchangeable?
Their ranges partly overlap, but they belong to different standards. Equivalence should be validated with the supplier and the project owner before ordering.
Need a quotation? E-Station draws up a priced offer, grade by grade, with a certificate of analysis and specified delivery terms. Request a quotation.